How to install and operate the ion wind Tsui

Mar 28, 2019 Leave a message

                                             How to install and operate the ion wind Tsui


Abstract: The electronics industry is the production of high-precision components. The impact of static electricity on the electronics industry is the most fundamental and most lethal.

After purchasing the ion wind Tsui, users can learn to install it themselves. The following small series details the installation and operation of the ion wind nozzle:




1. According to the application of the ion wind nozzle, select the appropriate matching parts and install the four screws on the base of the FC-988A. When installing, it can be close to the position of the mains power socket, and the FC-988A shell and ground wire. Connected, the device has a dedicated grounding terminal that can be attached to the mounting hole of the fixed seat.

2. The ion wind nozzle connects the air inlet pipe, the air outlet pipe and the power source, and the ion output is good for the workpiece device that needs to eliminate static electricity.

3. The ion wind nozzle must be equipped with an air (water separation) filter or a filter solenoid valve in front of the intake pipe.

4. After the power is turned on, the green light is on (power indication), and the red light is off or slightly bright is normal.