How To Install Anti-static Floor Tiles

Nov 01, 2022 Leave a message

How to install anti-static floor tiles

1. Steps:

1. Clean the ground;

2. Carefully check the flatness of the ground and the verticality of the wall. If it is found that it does not meet the construction requirements, submit it to the relevant departments of Party A;

 Pull the horizontal line, and use the ink line to bounce the floor installation height to the wall to ensure that the floor after laying is on the same level, measure the length and width of the room, and properly select the laying reference position to reduce the cutting of the floor, and pop up the installation bracket on the ground. the grid lines;

 Adjust the brackets to be installed to the same required height and place the brackets at the intersection of the ground grid lines;

3. Fix the beam to the bracket with screws, and use a level ruler to straighten the beam so that it is on the same plane and perpendicular to each other; use a suction plate to place the floor on the assembled beam: straight-angle ruler,

4. If the remaining size of the wall is smaller than the length of the floor itself, the method of cutting the floor can be used to make a profit;

5. Edge sealing;

6. Clean up the site and complete;

Precautions

1. When laying the floor, level it with a bubble level, and adjust the height of the floor by the bracket;

2. When placing heavy equipment in the computer room, a bracket should be installed under the floor of the equipment base to prevent the floor from deforming;

3. When the raised floor needs to be cut or opened, use an electric drill to drill Φ6mm-Φ8mm round holes at the corner of the opening to prevent the veneer from breaking. (1 day ago )

2, 1, clean the ground

2. Carefully check the flatness of the ground and the verticality of the wall. If it is found that it does not meet the construction requirements, submit it to the relevant departments of Party A;

Pull the horizontal line, and use the ink line to bounce the floor installation height to the wall to ensure that the floor after laying is on the same level, measure the length and width of the room, and properly select the laying reference position to reduce the cutting of the floor, and pop up the installation bracket on the ground. the grid lines;

Adjust the brackets to be installed to the same required height and place the brackets at the intersection of the ground grid lines;

3. Fix the beam to the bracket with screws, and use a level ruler to straighten the beam so that it is on the same plane and perpendicular to each other; use a suction plate to place the floor on the assembled beam: straight-angle ruler,

4. If the remaining size of the wall is smaller than the length of the floor itself, the method of cutting the floor can be used to make a profit;

5. Edge sealing;

6. Clean up the site and complete; (4 days ago)