SMT electrostatic basket installation steps



The installation problem of the SMT electrostatic basket has been plagued by our customers. Now I will show you the detailed installation steps to avoid problems after installation.
1. Install the sliding rack
Second, install the square column
Three, install the fixed side plate
Fourth, install the movable side panel
Five, install another piece of metal bottom plate
Sixth, adjust the movable side panel
A complete set of SMT electrostatic basket has been installed. This electrostatic basket is gear track adjustment.

