Anti-static Mat Laying Method

May 09, 2019 Leave a message

                                                                  Anti-static mat laying method


    1. Basic ground requirements:


1 The basic ground can be water-grinding ground, porcelain ground, and wooden ground.

2 The ground should be flat, no obvious unevenness, and the unevenness should be less than two thousandths.

3 The ground needs to have sufficient strength, no sanding and shelling. 4 The ground needs to be dry.


2. Construction procedures and specific methods:

1 Wash the impurities on the ground with 120# gasoline or xylene (with a washing machine);

2 For the laying of copper strips or aluminum strips on the ground, if the thickness of the copper strip is 0.02mm and the width is 25mm, the number of strips shall be determined according to the actual requirements of the ground laying, and the end of the laying copper strip shall be led to the ground.

3 After laying the grounding conductive mesh, clean and dry the floor, apply conductive glue, dry for 20-30 minutes, until the hand is not sticky, the bottom of the anti-static mat (black surface) is the same (coating conductive glue once), then The anti-static rubber sheet is bonded to the ground, and then rolled by a heavy roller for 5 times to make the surface of the anti-static rubber sheet neat and straight, and can be used after 48 hours at normal temperature.

4 The ambient temperature requirement during construction shall not be less than 25 degrees Celsius and the humidity shall not be greater than that of ventilation.

5 Conductive glue liquid resistance coefficient is not more than 108Ω, peeling strength Kg/2.5cm.

6 Conductive between the gaps, can be coated with conductive glue, or paste on the surface of the copper strip